Services/Data Center & Server Room
Mission-critical HVAC
Data center and server room cooling
Precision air conditioning, chilled water and air distribution for server rooms, data centers and telecom rooms across Metro Manila and Cebu. Start with the IT load; we size the rest in an online survey and quote.
Request a quote
Estimate your cooling load
Load
Estimate the cooling load
Almost every watt your IT equipment uses ends up as heat. Enter the IT load to see the cooling it needs and ways to cover it with our precision units.
Redundancy
24.0KW
Cooling
6.8TR
Tons
82K BTU/H
Per hour
20.0 kW of IT heat + 20% margin (4.0 kW) for lighting, people, UPS losses and the room.
Ways to cover it · N+1
| Unit | Duty | Standby | Installed |
|---|---|---|---|
| 3.0 TR | 3 | 1 | 12.0 TR |
| 7.5 TR | 1 | 1 | 15.0 TR |
| 5.0 TR | 2 | 1 | 15.0 TR |
Estimate only, using AR Korea precision unit sizes in our catalogue. The online survey and quote sizes it from your room's measured load.
Send this to us
Solutions
What we install
Precision air conditioners
AR Korea precision units built to run continuously and hold temperature and humidity for IT equipment. Air-cooled, water-cooled and chilled-water versions, single or dual refrigerant circuits.
See the precision rangeAir distribution
Supply and return paths planned around the racks: raised-floor, ducted or ceiling return, so cold air reaches the equipment intakes and hot air goes back to the units.
Ducting serviceChilled water
For larger facilities, chilled-water precision units served by a chiller plant, or connected to the building's existing chilled-water system.
Chillers and AHUsPreventive maintenance
Scheduled inspection, cleaning and testing so the units are ready when the load peaks, with a service report after each visit.
Maintenance serviceWhat the online survey asks for
- IT load
- kW from the UPS or PDU, now and planned
- Room
- Floor area, ceiling height, raised floor or slab
- Racks
- Number, layout and which way they face
- Redundancy
- N, N+1 or 2N: how much spare capacity you need
- Outdoor space
- Where condensers or a chiller can go
- Power
- Supply available for the cooling units
- Monitoring
- BMS or remote alarms you already use
- Existing units
- What is installed now and how old it is

Where the outdoor units go decides the piping run, the airflow around them and how they are serviced, so it is part of every survey.
Precision units in our catalogue
All models- 3 TRPrecision Aircon Single Circuits A1ST-U 3TROn request
- 3 TRPrecision Aircon Single Circuits A1EC 3TROn request
- 5 TRPrecision Aircon Single Circuits A1ST-U 5TROn request
- 5 TRPrecision Aircon Single Circuits A1EC 5TROn request
- 6 TRPrecision Aircon Dual Circuits A1ST-D 6TROn request
- 7.5 TRPrecision Aircon Single Circuits A1ST-U 7.5TROn request
- 7.5 TRPrecision Aircon Single Circuits A1EC 7.5TROn request
- 10 TRPrecision Aircon Dual Circuits A1ST-D 10TROn request
Unit prices. Installation is quoted after the online survey.

Project · Quezon City
Server Room Cooling
Precision cooling system for a data center with redundant units and raised floor air distribution.
How it works
5 steps · 1 now- 01Send the detailsIT load, room size and photos on WhatsApp or Viber.Now
- 02Online survey and quoteWe work out the load and send unit options with a quote.Next
- 03DesignUnit selection, redundancy, air distribution and piping layout.Then
- 04Installation and commissioningInstalled, tested and handed over with the controls explained.Then
- 05Maintenance planA preventive maintenance schedule for the units.Then
FAQ
Server room questions
Can a normal split aircon cool a server room?
A very small room with a light load sometimes can, usually with two units on alternating duty so one is always running. Comfort aircons are not built to run around the clock or to control humidity, so for anything larger we recommend precision units. The quote tells you which fits your room.
What do N, N+1 and 2N mean?
N is just enough capacity for the load. N+1 adds one spare unit, so a unit can fail or be serviced without the room heating up. 2N is a complete second set, used where downtime is not acceptable.
How do you size the cooling?
Almost all the power the IT equipment uses becomes heat, so the load starts from the IT kW. We add lighting, people, UPS losses and the room itself, then choose unit sizes and redundancy. The estimator on this page does the first step; the online survey and quote does the rest.
Is there a charge for the survey?
Send the IT load, room size and photos, and we reply with options and a quote. Site visits may carry transport or mobilization costs; we confirm before scheduling.
Talk to Mr. Aircon
Monday to Saturday, 8AM to 6PM