Mission-critical HVAC

Data center and server room cooling

Precision air conditioning, chilled water and air distribution for server rooms, data centers and telecom rooms across Metro Manila and Cebu. Start with the IT load; we size the rest in an online survey and quote.

Request a quote

Estimate your cooling load
AR Korea precision air conditioner for server rooms

Load

Estimate the cooling load

Almost every watt your IT equipment uses ends up as heat. Enter the IT load to see the cooling it needs and ways to cover it with our precision units.

From your UPS or PDU readout, or the rack nameplates.
1 kW200 kW

Redundancy

24.0KW

Cooling

6.8TR

Tons

82K BTU/H

Per hour

20.0 kW of IT heat + 20% margin (4.0 kW) for lighting, people, UPS losses and the room.

Ways to cover it · N+1

UnitDutyStandbyInstalled
3.0 TR3112.0 TR
7.5 TR1115.0 TR
5.0 TR2115.0 TR

Estimate only, using AR Korea precision unit sizes in our catalogue. The online survey and quote sizes it from your room's measured load.

Send this to us

Solutions

What we install

PAC

Precision air conditioners

AR Korea precision units built to run continuously and hold temperature and humidity for IT equipment. Air-cooled, water-cooled and chilled-water versions, single or dual refrigerant circuits.

See the precision range
AIR

Air distribution

Supply and return paths planned around the racks: raised-floor, ducted or ceiling return, so cold air reaches the equipment intakes and hot air goes back to the units.

Ducting service
CHW

Chilled water

For larger facilities, chilled-water precision units served by a chiller plant, or connected to the building's existing chilled-water system.

Chillers and AHUs
PMS

Preventive maintenance

Scheduled inspection, cleaning and testing so the units are ready when the load peaks, with a service report after each visit.

Maintenance service

What the online survey asks for

IT load
kW from the UPS or PDU, now and planned
Room
Floor area, ceiling height, raised floor or slab
Racks
Number, layout and which way they face
Redundancy
N, N+1 or 2N: how much spare capacity you need
Outdoor space
Where condensers or a chiller can go
Power
Supply available for the cooling units
Monitoring
BMS or remote alarms you already use
Existing units
What is installed now and how old it is
Two outdoor condensing units on pads beside a building, refrigerant piping run up the wall in covered trunking
Outdoor units on pads · piping in trunking up the wall

Where the outdoor units go decides the piping run, the airflow around them and how they are serviced, so it is part of every survey.

Server Room Cooling

Project · Quezon City

Server Room Cooling

Precision cooling system for a data center with redundant units and raised floor air distribution.

How it works

5 steps · 1 now
  1. 01Send the detailsIT load, room size and photos on WhatsApp or Viber.Now
  2. 02Online survey and quoteWe work out the load and send unit options with a quote.Next
  3. 03DesignUnit selection, redundancy, air distribution and piping layout.Then
  4. 04Installation and commissioningInstalled, tested and handed over with the controls explained.Then
  5. 05Maintenance planA preventive maintenance schedule for the units.Then

FAQ

Server room questions

Can a normal split aircon cool a server room?

A very small room with a light load sometimes can, usually with two units on alternating duty so one is always running. Comfort aircons are not built to run around the clock or to control humidity, so for anything larger we recommend precision units. The quote tells you which fits your room.

What do N, N+1 and 2N mean?

N is just enough capacity for the load. N+1 adds one spare unit, so a unit can fail or be serviced without the room heating up. 2N is a complete second set, used where downtime is not acceptable.

How do you size the cooling?

Almost all the power the IT equipment uses becomes heat, so the load starts from the IT kW. We add lighting, people, UPS losses and the room itself, then choose unit sizes and redundancy. The estimator on this page does the first step; the online survey and quote does the rest.

Is there a charge for the survey?

Send the IT load, room size and photos, and we reply with options and a quote. Site visits may carry transport or mobilization costs; we confirm before scheduling.

Talk to Mr. Aircon

Monday to Saturday, 8AM to 6PM

ViberWhatsAppCall

Message or call us

QR code that opens a Viber chat with Mr. Aircon

Scan with your phone camera to open our Viber chat.

Viber, WhatsApp and mobile

0917-524-7266

Landline

(02) 8477-1111

Message us on WhatsApp